Built in 60 days. Built to stay.

GOGER Advanced Building Technology builds villas and apartments from precast concrete walls hung on a hidden steel frame.

Get the house catalog العربية
A two-storey villa under construction at sunset. The left half is still a steel frame, the right half has its concrete walls and glass, a crane lifts the next wall panel. A finished concrete villa at dusk with warm light in every window, reflected in a pool.
Day 23: the frame is up, walls are going on Day 60: move in

Four things we build

A two-storey concrete villa at dusk with a lit garage and large windows.
Inland villas on the steel frame
A concrete beach house above the dunes on a bright day.
Coastal villas concrete only
A six-storey apartment building with balconies and a tree-lined street.
Apartments and hotels five to six storeys
A long concrete perimeter wall at night with a line of light built into its face.
Perimeter walls with light built in

Inland homes stand on a slim steel frame. By the sea we leave the steel out, because salt air rusts it, and the concrete walls carry the house on their own.

How a wall becomes a house

In the factory. Each wall is cast flat on a steel platform and cured before it travels. Window openings and channels for pipes and wiring are already in it.

Exploded drawing of a two-storey house: a steel frame on a foundation slab, with concrete wall panels, a floor slab and a roof slab sliding into place.

On site. A slim steel frame goes up on the foundation in days. The finished walls hang straight onto it, so nothing waits weeks for concrete to harden on site.

A crane sets a tall concrete wall panel onto a new house among finished homes.

By the end. The frame is closed inside the walls and never seen. What stands there is a concrete house you can paint any colour, built to last generations.

Workers tie steel reinforcement for a concrete foundation. Steel columns stand on a new foundation. A crane lifts a concrete wall panel with a window opening into place. Floor slabs laid across the frame. Pipes and wiring run through channels in the wall panels. A finished living room with concrete walls, tall windows and a fireplace.

Sixty days, step by step

  • The slab is poured while the walls are being cast in the factory, so the two jobs run at the same time.

  • Columns and beams bolt onto the foundation. For a coastal villa this step is left out.

  • The crane sets each finished wall onto the frame. A small crew closes in a whole floor in a few days.

  • Precast slabs go across the frame for the upper floor and the roof, then the roof is sealed.

  • Services run through channels already cast in the walls, with pipes kept inside the warm envelope.

  • Floors, kitchen, bathrooms and paint. A simple finish takes about a month, then you move in.

Planning figures for a two-storey villa. Every model in the catalog lists its own.

A woman on a sofa in a concrete living room while the window blinds lower on their own.

What the walls do for you

Blinds that answer to your voice

Light built into the wall

No frozen pipes in the ceiling

Stands up to hurricane wind

Concrete, not lumber

A concrete house that feels like home

Smooth walls take paint, plaster or tile. Inside it is quiet, warm in a cold snap and cool in summer.

A bright kitchen with an oak island and white cabinets. A double-height living room with a concrete wall, fireplace and tall windows. A calm bedroom with a large window onto pine trees.

Where we are building

A flatbed truck carries stacked concrete wall panels across the desert.

Oman · Morocco · Dubai · Qatar
China · Houston, Texas

A finished modern concrete house glowing at blue hour.

The house catalog

Floor plans, finishes and build times for every villa and apartment model. Open to members.